Quality·Manufacturing Status

Measurement Equipment Room

Equipment Status

Name Spec Quantity Maker
Hardness Tester Vickers Hardness Tester 300 / gf 1 SEIKI
Hardness Tester Rockwell Hardness Tester 500 / KG 1 AKASH
Shape Measuring Device 1000 / 1 1 Mitutoyo
Plating Thickness Tester DIN50987satisfy 1 BOWMAM
Vision Measurer 0 ~ 250 mm ( minimum scale : 0.001 mm ) 1 SEVEN OCEAN
3D Measurement Device HERO 7106S 1 DUKIN

Quality control room laboratory equipment

Video Meta
Rockwell Hardness Tester
Shape Measuring Device
Mounting Press
Vickers Hardness Tester
Digital Torque Wrench
Video Meta
Tensile Testing Machine
Plating Thickness Tester
Measurement Device

Manufacturing Process Flow

Material Receiving Process

  • Material Arrival : Raw materials are delivered.
  • Incoming Inspection : Verification of raw material specifications.
  • Material Property Confirmation : Confirmation of raw material composition.
  • Thickness, Width, and Visual Inspection : Inspection of dimensions and surface appearance.
  • Packaging and Weight Inspection : Checking packaging condition and weight.

    -If passed, materials are moved to the raw material warehouse.

Press Processing Workflow

  • Press Punching Operation : Initial punching process.
  • Visual Inspection of Formed Products : Checking for surface defects or irregularities.
  • Initial, Intermediate, and Final Inspection : Conducting inspections at all stages; records are maintained for traceability.
  • Dimensional Inspection of Formed Products : Regular dimensional checks (with records).

    -If passed, the product moves to the Barrel Process.

Barrel Processing Workflow

  • Barrel Operation : Initial barrel processing.
  • 1st Barrel Process : Deburring.

Heat Treatment Processing

  • Heat treatment is performed externally (outsourced)

Secondary Barrel Processing

  • 2nd Barrel Processing : Barrel operation to remove foreign materials generated during heat treatment.

Inspection

  • Post-Secondary Barrel Inspection : Inspection conducted after the 2nd barrel processing.

Packaging and Shipping

  • Final Inspection : If passed, products are packaged according to customer specifications.

Busbar Manufacturing Process Flow

Material Receiving Process

  • Material Arrival : Raw materials are delivered.
  • Incoming Inspection : Verification of raw material specifications.
  • Material Property Confirmation : Confirmation of raw material composition.
  • Thickness, Width, and Visual Inspection : Inspection of dimensions and surface appearance.
  • Packaging and Weight Inspection : Checking packaging condition and weight.

    -If passed, materials are moved to the raw material warehouse.

Press Process

  • Press Process

Plating Process

  • Plating Process

Press-Fit Process

  • Press-Fit Production Operation
  • Dimensional Inspection and Compression Strength Test of Press-Fit Products

Inspection Process

  • Visual Inspection of Plated Incoming Products
  • Plating Thickness Inspection (Refer to the plating inspection report)

Packaging and Shipping

  • Final Inspection : If passed, products are packaged according to customer specifications